Milk and Reconstituted Milk Process Flow

1. Milk Storage
2. Milk Inspection
3. Filtration
4. Cooling
5. Storage
6. Keep the milk for no longer than 24 hours
7. Melt Milk Powder
8. Hydratization
9. Standardization of Raw Material
10. Standardization of Dosing
11. Pasteurization
12. Milk Storage Tank
13. 85℃-90℃ /15seconds
14. Diameter of lipochondrion is controlled between 1μm and 2μm
15. Aseptic Filling
16. UHT Sterilization
17. Degassing
18. Homogenization
19. UHT Sterilization
20. Packaging-Storage-Transport-Distribution
21. Transport
22. Warehouse
23. Package
24. U-straw
25. Shelf-Life Experiment
26. Strict inspection needs to be carried out prior to turning on the filler. At least one worker is needed for monitoring of the production process
27. Temperature: 137℃±2℃
One operator should be exclusively responsible for the operation of UHT machine

As a professional milk production line manufacturer and supplier in China, our company provides a wide range of products, including aseptic filling machine, laminated liquid packaging material, water treatment equipment, U-straw applicator, and much more.

Related Names
Milk Production Plant | Milk Making Equipment | Milk Process Unit | Milk Machining Facility

Inquiry Form